Biotecture living hoardings installed at Stonecutter Court, London
Biotecture has designed and installed a green hoarding for repeat client Mace on the construction hoarding of the new Stonecutter Court development in London.
Stonecutter Court, close to Fleet Street and Farringdon, is being re-developed into a flexible, user experience-driven office building.
The new development, designed by Architect, TP Bennett, has strong sustainability credentials and is targeting a BREEAM Excellent rating and WELL Gold standard upon completion.
International construction and consultancy company, Mace, was appointed to develop the project. As sustainability is one of the biggest drivers of the new development, greening the construction hoarding was important for both the end client and the contractor.
Mace had already used the Biotecture PlantBox living hoarding at nearby Farringdon Road and so understood the benefits it can bring to a construction project.
As well as showcasing the client and contractor’s green credentials, the living hoarding will improve the appearance of the construction, and help improve air quality thanks to the removal of dust, dangerous particulates and harmful pollutants from the air by the plants. This creates a healthier environment for those working on site as well as those living and working in the surrounding area.
PlantBox living hoardings offer a far more sustainable choice than signage, artificial plastic greenery, or photographic panels of foliage, whilst avoiding issues with graffiti.
The principal requirement on this project was that the living hoarding had to be deployed in a relatively short timeframe to avoid disruption to those living, working and commuting in this busy part of London.
The PlantBox system is quick and easy to deploy principally because it is a free-standing system with no structural load on the hoardings. It only requires restraint fixings to the hoarding.
Another criterion was that the living hoarding had to be easy to maintain and continue to look its best for the duration of this 18 month project. The 2.4m standard height PlantBox system is fitted with a Hozelock connected irrigation system that allows the site team to easily carry our manual watering.
As the system is modular, on completion of the project, the PlantBox living hoarding can be simply moved to the next development or gifted to the local community as part of your CSR outreach, depending on the client preferences.
Biotecture is the UK’s leading living wall and living hoarding company, and this year is celebrating its 15th anniversary.
To find out more on PlantBox.
For more information on this project, visit: Stonecutter Court.
Featured articles and news
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.
Internally insulating a historical building
An experimental DIY approach using mineral thermal lime plaster.
Tree species selection for green infrastructure: A guide for specifiers.
The future of the Grenfell Tower site
Principles, promises, recommendations and a decision expected in February 2025.